YUSU

Facebook

Twitter

YouTube

flikr

Daily Info

Login (Help)

Endsleigh Advert Vote now

Blog

A pinch and a punch for the first of the month

Posted by Services and Finance Officer, 01/12/2008.

Wow.. time has flown since the last update!!

So, what's new...

The floor throughout is pretty much level now. Ready for the actual floor to be put in!

Electrics are installed, just waiting for decorations, etc, before the fittings are installed

All the ceilings are up, most of the walls, and plastering is taking place. Starting to feel more real now!

The cellar is almost ready for plastering - and feeling very insulated..

The bar is ready to have the counter built and starting to take shape

The kitchen is now ready for the extraction system to be installed, and then all the equipment will start to arrive.

The DJ booth is being built and taking shape!

The top balcony has been built up with drinks ledges, etc.. starting to feel more solid now.

Work has begun on the outside area with holes being dug to mount the posts and supports for the various items: decking, pergoda posts, jumberella posts. The planting areas are starting to be tidied up and the fence will be being built soon!

So.. in a nut shell, things are EXCITING and coming together!

Until next time,

MJB and his hard hat.
xx